Home > Company > History
- 2016
- 02 Acquired 5th environmental mark use certification for PASCON TROUGH
and PASCON dividing material (Korea Environmental
Industry and Technology Institute)
02 Contracted to supply electric TROUGH for Japanese highway (2nd)
- 2015
-
02 Contracted to supply new construction of electricity facility and
communication facility on Suseo High Speed Railroad
02 Contracted to supply power transmission and distribution and
signal construction on Busan Subway line no. 1 Dadae phase
08 Contracted to supply PASCON on electric facility on rice processing
complex in Fiji, the South Pacific
09 Registered design of ballast stopper for iron pole [Registration
no. 30-0816017]
09 Contracted to supply electric TROUGH for Japanese highway (1st)
09 Acquired Green Technology Certification
(Ministry of Science, ICT and Future Planning)
11 Registered patent for subterranean line
[Registration no. 10-1569672]
11 Moved NEXKOR CORP. headquarter
12 Contracted to supply power transmission and transformation of
Seoul subway line no. 9 extension construction phase 3
12 Registered patent for pipe support [Registration no. 10-1577604]
12 Acquired Green Technology Certification
(Ministry of Science, ICT and Future Planning)
- 2014
-
02 Acquisition for Certificate of Environment Mark
(Korea Environmental Industry and Technology Institute)
06 Registered patent for pipe stand [Registration no. 10-1412093]
10 Contracted to supply new construction of electricity facility on Suseo
High Speed Railroad Suseo ? Dongtan
12 Contracted to supply power substation and power transmission and distribution
on Daegu Metropolitan Transit line no. 1 West Extensio
- 2013
- 03 Supply contract of PASCON Separator for
KTX Honam Line (Osong ~ Kwangju)
- 2012
- 03 Supply contract of PASCON Trough for power transmission and
distribution on Incheon Urban Railway (Line 2)
- 2011
- 01 Improved PASCON Separator registered for utility model
- 2010
- 01 Changed company name to NEXKOR Co., Ltd
02 Acquisition for Certificate of Environment Mark
- 2009
- 03 Supply contract of PASCON Trough for ATC Signal line on
Busan subway(line 4)
05 Creation of R&D department
06 Supply contract of PASCON Trough for Anpyoung depot in
Busan subway (Line 4)
07 Supply contract of PASCON Trough for electric cable on
KTX Kyungbu line(East Daegu~Busan)
07 Supply contract of PASCON Trough for Gimhae light-subway
- 2008
- 02 Acquisition for Certificate of Environment Mark
05 Supply contract of PASCON Trough for electric cable on
KTX Kyungbu line(Ulsan~Busan)
06 Acquisition of the ISO 9001:2008 / ISO 14001:2004
- 2007
- 07 Supply contract of PASCON Trough for electric cable on
KTX Kyungbu line( East Daegu~Ulsan)
08 Contract of procurement with Public Procurement Service
- 2005
- 04 Established JooUn Tech Co., Ltd.
10 Acquisition for Certificate of Environment Mark